There are 5450 apartment buildings, out of 5500 that should be provided with heat, are connected to heat. And 150 schools, 195 kindergartens, 95 hospitals, and 675 enterprises are provided with thermal energy. There are more than 50 apartments without heating due to line damage.
Major and routine maintenance work of the Apartment and Public Entity Administration Department has been completed. Since the start of providing with heat heating, many damages have been fixed and repaired immediately. Four damages are currently being repaired. In addition, 24 out of 55 buildings without heating were connected to heat on September 25. Other damages are scheduled to be repaired in the near future.
It is planned to complete the technical repair between June 1 and October 15 as a part of the preparation for winter, and the completion is 85 percent. The routine repair work has been completed. Major maintenance work was carried out on three lines to ensure reliable operation during rush load of winter.
MEDIA AND PUBLIC RELATIONS DEPARTMENT OF THE GOVERNOR’S OFFICE OF THE CAPITAL CITY